New Wuwei client news (all media reporters Han Xiaobei Gao Deqiang) On the morning of October 20th, Wuwei City District Central Heating Co., Ltd. conducted ignition and debugging of the heating system.
During the ignition and commissioning of the heating system, Wuwei Urban District Central Heating Co., Ltd. will "warm up" the boiler to further strengthen the inspection and commissioning of the heating facilities, and solve the problems of system leakage and system balance in time. Get ready for official heating.
It is understood that from 2022 to 2023, the number of grid-connected heating households in Wuwei City's urban area will reach 220,000, and the grid-connected heating area will reach 24.69 million square meters. In order to ensure the normal operation of central heating this winter, Wuwei City District Central Heating Co., Ltd. arranged deployment as soon as possible, and carried out comprehensive maintenance of boilers, heating pipe network and other facilities and equipment in advance to ensure normal operation during the heating period. At the same time, each heat exchange station arranges "heating housekeepers" to provide professional heating services for the heating needs of the citizens, so as to truly achieve safe heating and high-quality heating, so as to ensure that the people are safe and warm during the winter.
"New Wuwei" client