China Railway Guangzhou Bureau Group Co., Ltd. specified the station building headquarters of China Railway Guangzhou Bureau Group Co., Ltd. .
The Station Building Headquarters of China Railway Guangzhou Bureau Group Co., Ltd. plans to conduct public bidding for the Shenshan Station station building and related engineering construction drawing review services.
Shenshan station has a total scale of 5 sets of 13 lines, including 2 sets of 6 lines in Shenshan field and 3 sets of 7 lines in Guangshan field. There are 4 island platforms and 1 side platform. Set up the connection line between Guangshan and Shenshan.
Shenshan station building and related projects are composed of railway station building project, Shenshan hub supporting project, simultaneous implementation project and Shenshan hub comprehensive development project, adopting the "station-city integration" development and construction model. The area of the station building is 53,000 square meters; supporting projects include bus depots, social parking lots, pedestrian bridges, , ramps, elevated outdoor platforms, ground parking lots, underground parking lots, indoor and outdoor urban public spaces, underground north-south connecting passages, and railway stations The steel structure and large roof other than the projection plane of the house, etc., have a total construction area of about 217,000 square meters; the simultaneous implementation projects are mainly municipal roads passing under the railway line and ground roads that provide access and exit functions for railway hubs, with a total area of about 22,000 square meters meters; the comprehensive development project is a complex with six floors above ground and two floors underground, with a total area of about 170,000 square meters. The estimated total investment of the project is about 6.7 billion yuan, of which the station building project is 2.74 billion yuan, which is funded by Shenzhen ; the estimated total investment of hub supporting projects and simultaneous implementation projects is about 2.174 billion yuan, which is funded by Shenshan Cooperation Zone finance; comprehensive The development project is about 1.84 billion yuan (including 540 million yuan for mechanical and electrical installation and other projects of the comprehensive development project that are not included in the scope of the construction drawing review).
Planned construction period: Project construction The total construction period is 3 years.