Another high-speed rail starts, 6 new stations! In the future, it will be directly connected to Xiamen

movie 1531℃

Another high-speed rail starts, 6 new stations! In the future, it will be directly connected to Xiamen - Lujuba

The reporter learned from the railway department on the 7th that the Shenzhen-Jiangmen high-speed railway (hereinafter referred to as Shenjiang high-speed railway ) will officially start construction in the near future.

The deep river high-speed railway is an important part of the coastal passage of my country's "eight vertical and eight horizontal" high-speed rail network. The line starts from the newly built Shenzhen Xili Station and runs westward through Dongguan City, Guangzhou City, Zhongshan City, and Jiangmen City. , connecting Jiangmen to Zhanjiang Railway Jiangmen Station, the main line is 116 kilometers long, and the construction period is 5 and a half years. There are 7 stations on the whole line, including Shenzhen Xili, Shenzhen Airport East, Dongguan Binhaiwan, Nansha, Zhongshan North, Henglan, Jiangmen Station , among which Jiangmen Station is an existing station, and Shenzhen Xili Station and other 6 stations are newly built. station.

The design speed of the Shenzhen-Xili-Nansha section of the Shenzhen-Xili high-speed railway is 200 kilometers per hour, and the design speed of the Nansha-Jiangmen section is 250 kilometers per hour. The proportion of bridges and tunnels in the whole line is 98%, of which the Pearl River Mouth Tunnel, which has a total length of 13.69 kilometers and a maximum buried depth of 106 meters, is a control project for the whole line; The project is a major and difficult project on the whole line.

Shenjiang high-speed railway connects Xiamen to Shenzhen high-speed railway in the east, and connects Jiangmen to Zhanjiang high-speed railway in the west. After the project is completed, it will greatly facilitate the travel of the people along the route.

Source: Shangguan News

Tags: movie