Luo Xiaoyun secretly visited Nanchang County and the flood control work in the new district

movie 2843℃

Two days later, on the afternoon of July 25, Luo Xiaoyun, deputy commander of the Provincial Department of Defense and Director of the Provincial Water Resources Department, took the form of unannounced visits without saying hello and in a light car, and came to Nanchang County, Xinjian District and other lakeside areas to inspect and guide flood control work. .

Luo Xiaoyun secretly visited Nanchang County and the flood control work in the new district - Lujuba

Observing the scattered and immersed, leakage hazards in the Shanwei Village of Lianwei, Jiangxiang,

, the implementation of inspection and rectification is a focus of this unannounced visit. In Jiangxiang Village, Jiangxiang Lianwei, Jiangxiang Town, Nanchang County, the levee body and the foot of the levee appeared in danger of infiltration and leakage. Luo Xiaoyun guided the inspectors to use the method of trenching and seepage, and asked water conservancy experts to strengthen guidance to control the danger as soon as possible. To prevent sudden changes, and urge the comrades of the supervision and inspection team to strengthen supervision and inspection to ensure that various measures for inspection of dykes are implemented. In the section of Shanwei Village of Lianwei, Jiangxiang, inspectors used the method of ditching and seepage to deal with the dangerous situation. Luo Xiaoyun said that the closer to the lake area, the greater the water level difference between the inside and outside of the levee. When small water flow and other signs of problems occur, they should be dealt with quickly to ensure safety. In the Beifan Natural Village of Shanwei Village, the vegetation and other obstacles have been cleared, and Luo Xiaoyun asked to increase inspections and investigations in complex areas to discover danger in time. In the Nanxin Village section of Nanxinlianwei, Nanxin Township, the dangers of leaching, leakage and accumulation of water at the foot of the embankment are obvious, and there has been a slight collapse. Luo Xiaoyun talked with patrol officers and water conservancy experts, and taught him to ditch and guide seepage and smoothly pave Disposal methods such as underground culvert pipes require encrypted inspection and monitoring. In Fanhu Village of Nanxin Lianwei County, Luo Xiaoyun inspected the danger, explained the types of dangers, the consequences and the disposal methods of various dangers to the local officials and the masses, and asked in detail about early rice harvesting, late rice harvesting, land circulation, mechanized planting, and the progress of drainage work. Happening.

Luo Xiaoyun secretly visited Nanchang County and the flood control work in the new district - Lujuba

Observe the scattered and seepage hazards in the Nanxin Village section of Nanxin Lianwei. In Wuxingwei in the newly built area, Luo Xiaoyun has a detailed understanding of the length of the embankment line, the height of the embankment, the elevation of the indentation platform and the embankment flood protection standards. In the east bank of Wuxingwei Village in Lianwei Town, there are many leaks at the foot of the embankment, and there are cow sheds. Luo Xiaoyun requires that grass and sundries be cleared in place and closed-loop management of dangerous situations is implemented. On the way back, Luo Xiaoyun also detoured to the Qianzhou village section of Twenty-Four Lianwei to learn about the discovery and disposal process of the danger of piercing and falling nests, and analyze it. Tu Jili, secretary of the Qianzhou village branch, found and reported the danger as soon as possible. The role of life protection levee safety is affirmed.

Luo Xiaoyun also inspected Chengzhu Lianwei and Nanhuwei of the Provincial Prison Bureau to inspect the dikes and deal with dangers.

Luo Xiaoyun secretly visited Nanchang County and the flood control work in the new district - Lujuba

Analyzed the danger of piercing and falling nests in the Qianzhou village section of 24 Lianwei. During an unannounced interview, Luo Xiaoyun pointed out that the current flood is slowly receding, but the water level is still high, the soil is relatively saturated, and the embankment body is soaked for a long time. reduce. We must thoroughly study and implement the spirit of General Secretary Xi Jinping’s important instructions on flood prevention and disaster relief work, and in accordance with the arrangements of the Party Central Committee and the State Council and the work arrangements of the provincial party committee and the provincial government, we must further consolidate our responsibilities, strengthen measures, and always tighten the prevention and fight against major floods. This string, increase the intensity of screening and inspection, clarify the safety of the embankment, and ensure the safety of the province during the flood.

Luo Xiaoyun pointed out that we must resolutely overcome paralysis of thoughts and relaxation. It has been more than 20 days since July 6th that the cadres and the masses were organized to inspect the levee. Some comrades have different degrees of physical fatigue and mental fatigue, which can easily lead to mental paralysis and relaxation. All localities should guide and encourage flood fighting personnel to continue to carry forward the style of not being afraid of fatigue and continuous combat, but also reasonably arrange and ensure that those participating in the flood fight have the necessary rest to relieve physical and mental fatigue. It is necessary to correctly deal with the widespread danger of infiltration and leakage. Dangerous conditions such as flooding and leakage are the precursors of landslides and landslides. The correct way to deal with such dangers is to ditch and guide infiltration. All localities must attach great importance to it and organize personnel and equipment to dig vertical and horizontal ditches in accordance with the actual conditions of infiltration and leakage to ensure the effective drainage of water in the foundation and body of the embankment, and truly prevent small risks from becoming major ones. It is necessary to intensify the investigation of hidden dangers of perforation. The danger of piercing is usually caused by hidden dangers such as ant dens, rat dens, and snake dens, which can easily lead to the risk of dike breach. Dyke inspection personnel should conduct targeted inspections on the dike sections where ant dens, rat dens, and snake dens may appear on the levee, especially the dike sections with shrubs, garbage and other obstacles at the foot of the dike and carry out key inspections. Excavation and investigation should be carried out on the embankment with obvious seepage points to ensure early detection, early disposal and early resolution of the danger.

Source: Jiangxi Water Resources

Tags: movie