Peninsula All Media Reporter Guo Zhenliang
On October 1st, the Taitung Weihai Road Overpass, built by China Green Construction Construction Group, was put into trial operation. The main body of the rebuilt new overpass is silver-gray, with a wider deck and upper and lower escalators. Different from before, the new overpass adopts a double-layer rainbow bridge structure. The first floor is mainly used for people to pass, and the arched passage on the second floor is suitable for viewing and taking pictures, further improving the comfort of citizens and tourists. Make it a new landmark of Taitung Pedestrian Street .
The Weihai Road Pedestrian Bridge on Taitung 3rd Road is located in a downtown area with a high density of people. During the hoisting and construction of the new overpass, the project department overcame the difficulties of high traffic density at night and many pedestrians on site, and rationally arranged the construction to make the overpass land safely; In the process of decoration and decoration of the main body of the overpass, the project department also fully coordinated, cross-work , overcoming many difficulties such as tight construction period and numerous procedures, to ensure that the new overpass will be unveiled as scheduled.
In order to take into account both beauty and practicability, the new flyover forms a city image in the shape of a three-dimensional link, emphasizing the sense of experience. The design mainly responds to three aspects: first, at the urban level, adapting to the energy level of the upgraded pedestrian street, creating a new brand symbol, and adapting to the requirements of the times; second, at the practical level, with the new underground The commercial street forms an upper and lower double passage to maximize the efficiency of traffic; third, in terms of experience, in addition to the municipal attribute, the overpass needs the landscape attribute. People can watch the prosperity of the pedestrian street from a new angle, and at the same time, it also adds a different kind of experience fun.
The new bridge has a total length of 89.47 meters. The plane inherits the original one-line shape and evolves into a semi-circle at the end as a viewing platform for viewing the pedestrian street. The main traffic flow, the arch bridge spanning diagonally above it is 3 meters wide and the highest point is 10.8 meters, providing a new image for the pedestrian street, emphasizing landscape and topicality, and adding another interest to the traffic; Duanzhiqiao and Duanzhiqiao together form a figure-eight loop path, which is a walking system that can cycle indefinitely, symbolizing Taitung's century-old industrial and commercial prosperity and endless life.
In addition, the new flyover is equipped with a UV disinfection device and a crowd monitoring system on the elevator handrail. The ultraviolet disinfection device can achieve 24-hour disinfection and sterilization, escorting the prevention and control of the epidemic; the crowd monitoring system can better monitor the flow of people, and provide timely warning through data to avoid accidents. A new page of
has been opened. In the urban renewal and historical changes, the new flyover will take over the heavy task and complete the relay. As the memory of a generation of Qingdao people, the Weihai Road Pedestrian Bridge on Taitung 3rd Road has carried the rush and laughter for nearly two decades. As a landmark achievement of urban renewal, the new overpass will become the gateway to the new Taitung journey. The key, let the people feel the improvement of the quality of life brought by the urban renewal , and make the convenient and fashionable Taitung Commercial Street a place for foreign tourists and local residents to visit and check in.