In Jinan in April, the spring tide surges. On the busy and orderly construction site, the builders use sweat and wisdom to write the story of spring and draw a blueprint for the future. Let us go to the construction site of Line 4 from an aerial perspective to feel the vitality a

In Jinan in April, the spring tide surges. On the busy and orderly construction site, the builders use sweat and wisdom to write the story of spring and draw a blueprint for the future. Let us go to the construction site of Line 4 from an aerial perspective to feel the vitality and vitality of "running in spring".

html The Municipal Wuyuan Station of Phase 1 of Line 04 (project name)

The Municipal Wuyuan Station is located in the southeast quadrant of the intersection of Jingshi Road and Nanxinzhuang West Road, and is arranged east-west along Jingshi Road. The station has a total length of 188.4m and a standard section width of 23.3m. It is an underground two-story island platform station. Currently, the main structure of the Municipal Wuyuan Station is under construction.

4 Line Phase 1 Municipal Wuyuan Station (Project name) Super wide-angle panorama

html Line 04 Phase 1 Bayi Overpass Station (Project name)

Bayi Overpass Station is located at the intersection of Weier Road and Jingshi Road, east-west along Jingshi Road To layout. The total length of the station is 188.4m, the standard section width is 24.9m, and the expanded end width is 29.4m. It is an underground three-story, two-column, three-span island-type station. Currently, the construction of the enclosure structure of the Bayi Overpass Station is underway.

html Vertical overhead shot of Bayi Overpass Station, Phase 1 of Line 04 (Project name)

html Line 04 Phase 1 Qianfoshan Station (Project name) Super wide-angle panorama

Qianfoshan Station is located at the intersection of Jingshi Road and Lishan Road, east-west along Jingshi Road Arranged vertically, the station has a total length of 325.5m and a standard section with a net width of 22.7m. It is an island-type station with two underground floors (some three floors). Currently, the main structure of Qianfoshan Station is under construction.

4 Line Phase 1 Qianfoshan Station (Project name) Aerial animation

html Line 04 Phase 1 Shanshi East Road Station (Project name)

Shanshi East Road Station is located on the east side of the intersection of Jingshi Road and Shanshi East Road, along the No. 10 is arranged in an east-west direction. The overall length of the station is 309.25m, and the standard section has a clear width of 20.7m. It is an underground 2-story island station. Currently, the main foundation pit excavation and structural construction of Shanshi East Road Station are underway.

4 Line Phase 1 Shanshi East Road Station (Project name) Aerial animation

html Line 04 Phase 1 Shanda Road Station (Project name)

Shanda Road Station is located at the intersection of Jingshi Road and Shanda Road, and is laid east-west along Jingshi Road. The main structure of the station is a single-column double-span construction using the open-cut method (partial cover excavation method). The total length is 181.89m, and the standard section net width is 22.52m. It is an island-type station with two underground floors and three floors in parts. Currently, earth excavation construction is underway at Shanda Road Station.

As of now, all 33 stations on the entire line have been put into operation, of which 22 stations have achieved the capping of the main structure, 8 stations are in the construction stage of the main structure, and 3 stations are undergoing earthwork excavation construction; there are a total of 35 sections on the entire line, of which 21 Dual-line tunneling has been achieved in the section, and 51 shield machines have been driven down the mine, 51 have been launched, and 36 have been received. Currently, 12 shield machines are excavating.

Source: Jinan Rail Transit WeChat official account