On the morning of August 31st, a brief groundbreaking ceremony was held at the project site. Lin Hai, Zheng Shuang
Hubei Daily News (Reporter Wang Hongyu Correspondent He Yawen) On August 31, the Three Gorges General Navigation Engineering Inspection and Maintenance Base officially started. The construction of this project will better meet the maintenance needs of the Three Gorges Ship Lock, the Three Gorges Ship Lift, the Gezhouba Ship Lock and the navigation supporting facilities, improve the rapid maintenance capabilities of the navigation facilities, the emergency repair and rescue capabilities of the two dam ship locks and the ship locks. The technical level of operation and maintenance provides a reliable guarantee for the safe, smooth and efficient navigation of the river section of the Three Gorges Project.
The construction of the project was approved by the Ministry of Transport, with a total estimated budget of 216 million yuan. The land area is about 48,400 square meters, and the new production and auxiliary buildings are 17,800 square meters. The planned construction period is 36 months. The project plans to set up repair area and storage and waiting area. The relevant person in charge of the Three Gorges Navigation Administration of the Yangtze River said that by virtue of its status as a shipping hub in the dam area and the transportation advantages of the Three Gorges dam-turning hub, the project will be built into a new energy technology application, clean energy utilization, new product manufacturing and promotion. Integrated Demonstration Park.
The client of Hubei Daily, which pays attention to major events in Hubei and the world, not only pushes authoritative policy interpretations, fresh hot information, practical and convenient information for users, but also launches a series of special functions such as palm reading, reporting, learning, and online interaction. .