Many owners just think about decoration after getting the keys to their new house. Don’t be so impatient. The more important first step is to conduct an inspection of the whole house, which is what we call the rough house acceptance work, to see if the developer has done anything

Many owners start thinking about renovations when they get the keys to their new house. Don’t be so impatient. The more important first step is to conduct an inspection of the whole house, which is what we call rough house acceptance work, to see if the developer is perfunctory. Done.

When accepting the rough house, the most important things you need to pay attention to are the following five aspects. You must open your eyes and check carefully.

1. Door and window acceptance

1. Doors and windows are directly related to our daily living safety, so the first step is to check. First check whether the model and material of the doors and windows are the same as stated in the contract.

2. Then check whether the door panel is damaged or deformed. During decoration, materials and tools come in and out. If you are not careful, the door panel will be scratched. We must check the rough house in advance to prevent the later decoration company from cheating. No more responsibility.

3. The next step is to check whether there are obvious scratches on the window glass, whether the sealing strips and pulleys are intact, and whether the handle can be used normally. In addition, remember to ask workers to take necessary protective measures on doors and windows during renovation.

4. Check whether the window opens and closes smoothly and flexibly, and whether the five accessories are fully matched and intact.

2. Wall and floor acceptance

Wall acceptance is the easiest place to find problems. Many small details will be ignored if you don't pay attention.

1. Cracks parallel to the beams are actually not dangerous. You only need to ask the bricklayers to repair them during decoration. However, if the cracks are at a 45° angle to the corner or directly perpendicular to the beams, it means that the room has settled very quickly. If it is serious, you need to contact the property management company in time for processing.

2. It is also a big deal if there are gaps in the counterweight walls on both sides of the balcony; if the cracks in the load-bearing wall have penetrated the entire wall, or even penetrated to the back, then this room will be very dangerous, and you must contact the property management. So as not to affect later residence.

3. Tap the wall with a small hammer to check whether there is a large hollow area on the wall. The hollow but not cracked area must not exceed 200c㎡. If you are building walls during decoration, you should also pay attention to the phenomenon of hollowing.

4. After the rough house is built for a period of time, the unripe lime particles in the base layer will expand when exposed to water, which will easily lead to holes in the wall. This can generally be remedied through decoration.

5. Use a tape measure to measure the height of several different places. If the floor height is stated as 2.8m, the actual height cannot be less than 2.6m; if it is 3m, the actual height cannot be less than 2.75m. If the space is too low and depressing at first, you can use decoration techniques to develop visual effects later.

6. Use the ruler and wedge feeler gauge to check whether the overall flatness and verticality meet the requirements. The flatness and verticality of the yin and yang angle should be less than 4mm.

7. Check carefully whether the roof is discolored, blistered, peeling or even dusty. These are all caused by leaks. It may be that the waterproofing work of the residents upstairs is not done well.

8. Many owners will ignore this aspect of exterior wall acceptance. You can wait until it rains to observe whether there are leaks in the exterior walls and windows, so that you can see whether the joints are sealed tightly. If leakage occurs, report it to the developer immediately to resolve the problem.

3. Acceptance of water, electricity and coal

1. The leakage protection of sockets in the whole house needs to be checked to see if it is normal. The leakage action current cannot be greater than 30mA. If there are multiple road closures, check whether the bribery can load normally. . Later installation may displace the distribution box. Remember to check after changing the location.

2. Check whether the lines of the weak current system (cable, network, telephone) are smooth. If the circuit is modified, pay attention to keeping the vertical distance between strong and weak current at least 1m. If the distance does not meet the requirements, it will affect the use of TV and Internet.

3. Check all switches in the distribution box for any problems. If they are loose, tighten or replace them in time. If the distribution box is moved, remember to remind the electrician to mark the switch to ensure safe use of electricity.

4, gas meters, electricity meters, and water meters must be checked one by one to see if the valves are tight and whether they can operate normally.

4. Pipeline acceptance

1. Check whether the gas alarm device can be used normally and whether the solenoid valve automatically closes when the alarm occurs.During later decoration, if the gas pipeline needs to pass through the living room and other places, there should be no interfaces in the pipeline to prevent gas leakage.

2. Check whether the sewer pipes are damaged or cracked, and whether vents are reserved on the bathroom ceiling. These places are very hidden, and single pages are prone to problems. You must keep your eyes open during acceptance.

3. Open the water valve and check whether the water outlet from the water pipe is smooth. When draining the water, you can touch the pipe with your hand to see if there is any leakage.

4. The pipeline installation must be stable and firm and well-sealed. During the preliminary acceptance, no downpipes or interfaces in the kitchen, bathroom, and balcony can be spared.

5. Ventilation system acceptance

This is an issue that is easy to forget, but flues and exhaust ducts often bring hidden dangers to daily life, so they must not be forgotten during acceptance.

Finally, here is the detailed acceptance form for rough housing compiled by the editor. When you get the house, you can check it carefully according to the form before paying, so don't be fooled.